top of page

Ice Installation

Whether curling or hockey ice, we can have an ice installation plan to meet your needs.

​

Curling

  Installation from the ground up

  • Levelling floods

  • Painting white and sealing

  • Hack and divider installation

  • Lines

  • Cutting and painting circles, or placement of vinyl rings

  • Placement of all decals, in-ice logos and advertising

  • 3 Leveling floods over finished product

Ensure a clean pad set to 16ËšF 3 days prior to install

​

  Installation from a level pad

  • Painting white and sealing

  • Hack and divider installation

  • Lines

  • Cutting and painting circles, or placement of vinyl rings

  • Placement of all decals, in-ice logos and advertising

  • 3 Leveling floods over finished product

Ensure a level pad of 3-4 open hose floods prior to install

​

  Installation from a painted level pad

  • Hack and divider installation

  • Lines

  • Cutting and painting circles, or placement of vinyl rings

  • Placement of all decals, in-ice logos and advertising

  • 3 Leveling floods over finished product

Ensure a level pad of 3-4 open hose floods, as well as a fully painted and sealed ice surface with one sealing flood prior to install

​

  Full installation of vinyl sheets

  • Levelling floods

  • Hack and divider installation

  • Placement of all decals, in-ice logos and advertising

  • 3 Leveling floods over finished product

​​​

Hockey

  Installation from the ground up

  • Levelling floods

  • Painting white (14 bags)

  • Paper line kit install

  • Placement of all decals, in-ice logos and advertising

  • 2 Leveling floods over finished product

Ensure a clean pad set to 16ËšF 3 days prior to install

​

  Installation from a level pad

  • Painting white (14 bags)

  • Paper line kit install

  • Placement of all decals, in-ice logos and advertising

  • 2 Leveling floods over finished product

Ensure a level pad of 3-4 open hose floods prior to install

​

  Installation from a painted ice

  • Paper line kit install

  • Placement of all decals, in-ice logos and advertising

  • 2 Leveling floods over finished product

Ensure a level pad of 3-4 open hose floods, as well as a fully painted and sealed ice surface with one sealing flood prior to install

​

Contact us for pricing

bottom of page